See where every hectare of irrigation potential goes, and who can bring it back.
Sinchai keeps a ledger for every scheme, every season: the potential created, how much of the scheme still works, how much land was actually watered, and the reason for the rest. A pump, a canal, the power supply, a river that moved, a field left fallow. Planners see the gap by cause and by owner, on one map, and know which repairs bring back the most land.
| Rabi potential created from the scheme's records and DPR | 650 ha |
| Not delivered: canal breach at RD 1.2 km Irrigation O&M · petty repair under the SOP | −140 |
| Water available, no rabi crop grown Agriculture Department · rabi plan | −120 |
| Land irrigated this season Sentinel-2, checked at 6 field points | 390 ha |
The potential is counted once. Its loss is counted nowhere.
Assam's created irrigation potential is counted in lakhs of hectares, built up over five decades of schemes. The area actually irrigated in a year is a fraction of it. Both numbers are known. What sits between them, scheme by scheme, is not.
The gap is made of very different things. A transformer stolen at one lift scheme. A river that has moved half a kilometre from another's intake. A canal breach. A feeder that gives eight hours of power. Command areas where the water is there but the land stays fallow after the sali harvest. Each has a different owner, and a different fix.
Today these reasons live in the division's knowledge and in letters. The monthly return carries a single utilisation figure, without its reason, and there is no independent way to check it from Dispur.
Potential created: 10.59 lakh ha (Irrigation Department, Annual Administrative Report 2022-23); the State Irrigation Plan (Dec 2024) notes that some schemes counted in the Statistical Handbook no longer exist. Utilised: about 2.98 lakh ha in 2023-24 (State Economic Survey, reported by the Assam Tribune, Feb 2026). In September 2023 the Minister told the Assembly that 1,585 of 3,919 schemes were not working (The Sentinel). A CAG audit of 73 minor projects (published 2021) found monthly utilisation reports hard to rely on, including non-working projects shown as irrigating.
The schemes are mapped and counted. Sinchai explains each season's gap.
IPMS and the INO Irrigation app
The Department's portal geotags every scheme, records its working status, collects farmers' grievances and holds the Irrigation GIS. It is the one place that knows where each scheme is and whether it works.
The Minor Irrigation Census
The Department runs the census in Assam. It records every minor scheme, whether it is in use, the reason if it isn't, and its potential created and used. The 7th census, for the reference year 2023-24, is the latest round.
The gap: a seasonal answer, scheme by scheme
Between censuses, the question is how much of the potential created was irrigated this season, and why the rest wasn't. That needs a measure of irrigated land every season and a reason against every lost hectare.
Satellite estimates of irrigation potential utilised have been made in Assam before, for the Dhansiri and Champamati projects (NESAC Annual Report 2018-19).
Three ideas, one ledger
Every hectare of created potential is either irrigated or lost for a named reason.
For each scheme and season, Sinchai splits the created potential into four parts: land actually irrigated; potential lost because the scheme isn't serviceable; water the scheme couldn't deliver; and land where water was available but no rabi crop was grown.
Each loss carries its cause and its owner: Irrigation O&M, APDCL, the Agriculture Department, or a river. Repairs are sorted into the five categories of the Department's 2024 O&M procedure, so the revival list is ready when estimates are due in August.
In Assam, a lift scheme can be lost without anything breaking.
The Department's own plan lists change of river course among the main threats to flow and lift schemes. Braided channels move every monsoon. A pump house can end up beside a dry bed.
After each monsoon Sinchai draws the water line from radar and optical images and measures the distance from every intake and headworks to the nearest flowing channel. Where it has moved, the scheme is flagged before the rabi season, with the options: a pontoon intake, a longer suction line, or relocation. The same water line shows where a new channel now runs past unserved cultivable land.
The satellite gives a second opinion. A field check settles it.
Each dry season Sinchai estimates the land irrigated inside every command area from Sentinel-2 images: fields that stay green through rainless weeks. It sits next to the reported figure. Where they agree, nothing more is needed.
Where they differ by more than the satellite's range, Sinchai picks four or five points and sends a field check to the JE: is this field irrigated, what crop, is there water at the intake. The answer, with photos, goes into the ledger as the reason. In the monsoon, irrigated and rain-fed paddy look alike from space, so kharif figures stay with the field records.
| Scheme | Reported | Satellite | |
|---|---|---|---|
| Bihpuria FIS | 420 ha | 390 ± 35 | Agrees |
| Nowboicha FIS | 240 ha | 230 ± 24 | Agrees |
| Ghilamara LIS | 180 ha | 14 ± 8 | Field check sent |
Built around the Department's existing systems
- IPMS stays the scheme registerScheme list, geotags, status and staff are read from IPMS. Sinchai's ledger and command areas are offered back to it.
- DPRs and existing GIS layersCommand areas come from the Department's GIS files, DPR maps or KML, confirmed by the division before use.
- The O&M procedure's repair categoriesEvery recoverable loss is filed under the SOP's five categories, in time for the August estimates.
- Agriculture Department accessIPMS is already opening "area irrigated" to Agriculture officials. Sinchai gives them the fallow command land to plan rabi crops on.
- PM Gati Shakti and other agenciesLayers are published as standard map services, so other departments see the same command areas.
- Open satellite dataSentinel-1 and Sentinel-2 imagery, free and open, processed each season on government-approved hosting.